Weider 8510 User's Manual | Page 9

Weider Home Gyms User's Manual - 8510.
Download
Page  of 27
4.8, 2190 votes
background image

9

CABLE ASSEMBL

Y

11. During steps 11 through 25, refer to the

CABLE DIAGRAM on page 20 of this manual
to verify proper cable routing. Before begin-
ning this section, identify the Long Cable (23)
and the Short Cable (58) by comparing the
lengths and ends of the cables. 

IMPORTANT: While assembling the cables,
do not overtighten the bolts and nuts
securing the pulleys. The pulleys must be
able to turn freely.

12. Locate the Long Cable (23). Route the Long

Cable around the indicated 3 1/2Ó Pulley (15)
attached to the Top Frame (55). Be sure that
the end of the Cable with the ball is on the
indicated side of the Pulley and that the
Cable is between the Pulley and the hook.
Tighten the 3/8Ó x 3 3/4Ó Bolt (71) and the 3/8Ó
Nylon Locknut (not shown).

13. Wrap the Long Cable (23) around a ÒVÓ-Pulley

(6). Attach the ÒVÓ-Pulley and a Long Cable
Trap (50) to the indicated bracket on the
Front Upright (42) with a 3/8Ó x 2 1/2Ó Bolt (7)
and a 3/8Ó Nylon Locknut (21). Be sure that
the Long Cable Trap is positioned to hold
the Cable in place.

14. Route the Long Cable (23) around the ÒVÓ-

Pulley (6) on the Left Arm (47). Be sure that
the Cable is in the groove of the Pulley
and that the Long Cable Trap (50) is posi-
tioned to hold the Cable in place. 
Tighten
the 3/8Ó x 2 1/2Ó Bolt (7) and the 3/8Ó Nylon
Locknut (not shown).

14

11

12

13

58

23

55

71

Hook

Ball

15

50

23

7

47

23

7

21

6

50

23

6

42

 

0.549020s