Trane IntelliPak II 90 to 162 Tons Manuals
Trane Rooftop Systems IntelliPak II 90 to 162 Tons manuals download on ManualAgent: Brochure, Installation and Maintenance Manual, Catalogue, Programming Guide
-
-
-
-
Document Outline
- Introduction
- Table of Contents
- Model Number Descriptions
- Unit Inspection
- General Information
- Unit Clearances
- Dimensional Data
- Weights
- Installation
- Roof Curb and Ductwork
- Field Converting Horizontal Ductwork (Supply or Return) from Right to the Left Side
- Unit Rigging and Placement
- Air-Cooled and Evaporative Condensers— Three-Piece Unit Fit Up
- Air-Cooled and Evaporative Condensers— Two-Piece Unit Fit Up
- Complete Tubing and Wiring Connections as follows:
- Air-Cooled Tubing Connection
- Evaporative Condenser Tubing Connection
- Electric Heat Wiring Connection
- Power and Control Wiring Connections
- General Unit Requirements
- Rigging the Unit
- Main Electrical Power Requirements
- Field Installed Control Wiring
- Requirements for Electric Heat Units
- Requirement for Gas Heat
- Requirements for Hot Water Heat
- Requirements for Steam Heat
- O/A Pressure Sensor and Tubing Installation
- Condensate Drain Connections
- Units with Gas Furnace
- Removing Compressor Assembly Shipping Hardware
- Removing Supply and Exhaust Fan Shipping Channels
- Spring Isolators
- Remove Evaporative Condenser Fan Shipping Brackets
- O/A Sensor and Tubing Installation
- Units with Statitrac:
- Evaporative-Cooled Condenser Make-up Water and Drain Line Installation
- Gas Heat Units
- Disconnect Switch w/External Handle
- Electric Heat Units
- Main Unit Power Wiring
- Power Wire Sizing and Protection Devices
- Field Installed Control Wiring
- Controls using 24 VAC
- Controls using DC Analog Input/Outputs
- Constant Volume System Controls
- Variable Air Volume System Controls
- Constant Volume or Variable Air Volume System Controls
- Single Zone Variable Air Volume & Rapid Restart System Control
- Emergency Override
- Ventilation Override Module (VOM)
- Temperature vs. Resistance Coefficient
- Installation Checklist
- Unit Startup
- Sequence of Operation
- Cooling Sequence of Operation
- Compressor Sequence of Operation
- Units with Evaporative Condenser Sequence of Operation
- Modulating Dehumidification (Hot Gas Reheat) Sequence of Operation
- Energy Recovery Sequence of Operation
- Gas Heating Sequence of Operation Standard
- Honeywell Ignition System
- Modulating Gas Sequence of Operation
- Electric Heat Sequence of Operation
- Electric Heat—CV, VAV Daytime Warm-up
- VAV Active Occupied Discharge Heating
- SZVAV Occupied Heating
- Demand Control Ventilation Sequence of Operation
- Return Fan Sequence of Operation
- Wet Heat Sequence of Operation
- Unit Startup Check List
- Voltage Supply and Voltage Imbalance
- Service Testing—Evaporative Condenser Components
- Verifying Proper Fan Rotation
- If all of the fans are rotating backwards;
- If some of the fans are rotating backwards;
- System Airflow Measurements
- Exhaust Airflow Measurement (Optional)
- TRAQ™ Sensor Airflow Measurement
- Performance Data
- Pressure Curves
- Components
- Standard Unit without Energy Recovery Wheel
- Standard Unit with Energy Recovery Wheel
- Energy Recovery Wheel (ERW)
- Service and Repair
- Seal Adjustment
- Compressor Startup
- Compressor Operational Sounds
- Evaporative Condenser Startup
- Thermostatic Expansion Valves
- Measuring Superheat
- Charging by Subcooling
- Standard Ambient Units
- Electric, Steam and Hot Water Startup
- Gas Furnace Startup
- Two Stage Gas Furnace
- Full Modulating Gas Furnace
- Final Unit Checkout
- Sequence of Operation
- Service and Maintenance
- Unit Wiring Diagram Number
- Warranty and Liability Clause
-
Document Outline
- Overview of Manual
- Table of Contents
- Model Number Descriptions
- General Information
- Dimensional Data
- Pre-Installation
- Installation
- Unit Weights
- Roof Curb and Ductwork
- Pitch Pocket Location
- Field Converting Horizontal Ductwork from Right to the Left Side
- Unit Rigging and Placement
- Lifting the External Piping Enclosure
- Gas Heat Units
- Hot Water Heat Units
- Steam Heat Units
- General Coil Piping and Connection Recommendations
- Chilled Water Units
- Electrical Data
- Controls
- Sequence of Operation
- Performance Data
- Unit Start-up
- Maintenance
- Wiring Diagrams
- Index
- Warranty and Liability Clause