Dell PowerConnect B-RX4 Manuals
Dell Servers PowerConnect B-RX4 manuals download on ManualAgent: Getting Started Guide, Installation Manual, Replacement Procedure
-
Document Outline
- In this guide
- Introduction
- Four-slot chassis
- Eight-slot chassis
- 16-slot chassis
- Items required for installation
- Site planning and safety guidelines
- Unpacking the PowerConnect B-RX Series
- Chassis lifting guidelines for PowerConnect B-RX Series
- Installing a PowerConnect B-RX Series chassis in a rack
- Installing modules
- Installing power supplies
- Connecting AC power
- Connecting DC power
- Managing cables
- Attaching a management station
- Powering-on the power source
- Verifying proper operation
- Assigning passwords
- Configuring IP addresses
- Connecting the PowerConnect B-RX Series to a network device
-
Document Outline
- BigIron RX
- Contents
- About This Document
- Product Overview
- In this chapter
- Product overview
- Hardware features
- Chassis
- Management modules
- Interface modules
- 2-port 10 Gigabit Ethernet module
- 16-port 10 Gigabit Ethernet oversubscribed module
- Gigabit Ethernet interface module (SFP)
- 48-port 1 Gigabit Ethernet interface module (Mini RJ 21 Copper)
- Switch fabric module
- Power supplies
- Cooling system
- LEDs
- Rack mount kit
- Supported software features
- Installing a BigIron RX Series Switch
- In this chapter
- Installation precautions
- Installing a BigIron RX-4 switch
- Preparing the installation site
- Unpacking a BigIron RX-4 switch
- Chassis lifting guidelines for BigIron RX-4 switches
- Installing a BigIron RX-4 chassis in a rack
- Installing BigIron RX-4 modules
- Installing power supplies in a BigIron RX-4 chassis
- Connecting AC power to a BigIron RX-4 chassis
- Connecting DC power to a BigIron RX-4 chassis
- Final steps
- Installing a BigIron RX-8 switch
- Preparing the installation site
- Unpacking a BigIron RX-8 switch
- Chassis lifting guidelines for BigIron RX-8 switches
- Installing the BigIron RX-8 chassis in a rack
- Installing BigIron RX-8 modules
- Installing power supplies in the BigIron RX-8 chassis
- Connecting AC power to a BigIron RX-8 chassis
- Connecting DC power to a BigIron RX-8 chassis
- Final steps
- Installing a BigIron RX-16 switch
- Preparing the installation site
- Unpacking a BigIron RX-16 switch
- Chassis lifting guidelines for BigIron RX-16 switches
- Installing a BigIron RX-16 chassis in a rack
- Installing BigIron RX-16 modules
- Installing power supplies in a BigIron RX-16 chassis
- Connecting AC power to a BigIron RX-16 chassis
- Connecting DC power to a BigIron RX-16 chassis
- Final steps
- Installing a BigIron RX-32 switch
- Attaching a management station
- Powering-on the power source
- Verifying proper operation
- Using the Brocade Structured Cabling Components
- In this chapter
- Cable Cinch overview
- mRJ-21 procedures
- RJ-45 procedures
- Cable Cinch with one group of RJ-45 cables
- Cable Cinch with two groups of RJ-45 cables
- Cable Cinch with three groups of RJ-45 cables
- Cable Cinch with four groups of RJ-45 cables
- Cable Cinch with five groups of RJ-45 cables
- Cable Cinch with six groups of RJ-45 cables
- Cable Cinch with seven groups of RJ-45 cables
- Cable Cinch with eight groups of RJ-45 cables
- Connecting a BigIron RX Series Switch to a Network Device
- Managing the BigIron RX Series Chassis and Modules
- In this chapter
- Managing the BigIron RX Series chassis
- Managing the cooling system
- Managing the interface modules
- Configuring interface module boot parameters
- Synchronizing the interface module’s IronWare images between management and interface modules
- Specifying an immediate boot
- Changing priority of chassis slots for interface modules
- Disabling and reenabling power to the interface modules
- Disabling and reenabling power to the switch fabric modules
- Enabling and disabling management module CPU usage calculations
- Displaying management module CPU usage
- Enabling and disabling packet logging for management and interface modules
- Removing MAC address entries
- Maintaining a BigIron RX Series Switch
- Upgrading Software Images and Configuration Files
- In this chapter
- Software images required
- Software image naming conventions
- Displaying flash memory and version information
- Upgrading the BigIron RX Series software
- Changes to software images starting with version 02.5.00
- Command change
- Unified software image upgrade to upgrade release 02.6.00 and later
- Unified software image upgrade to upgrade release 02.2.01 to 02.5.00
- Upgrading software releases prior to release 02.2.01
- Basic tasks in the software upgrade process
- Upgrading the management module’s monitor and boot images
- Upgrading the management module’s IronWare image
- Upgrading the interface module’s monitor and boot images
- Upgrading the interface module’s IronWare image
- Rebooting the management module
- Upgrading the MBRIDGE FPGA on the management module
- Hitless Layer 2 OS upgrade
- Loading and saving configuration files
- Dynamic configuration loading
- Using SNMP to save and load configuration information
- Erasing image and configuration files
- File synchronization
- Scheduling a system reload
- Diagnostic error codes and remedies for TFTP transfers
- Hardware Specifications
- Regulatory Statements
- Caution and Danger Notices
- Software Specifications
-
Related Models for Dell Servers PowerConnect B-RX4
- Dell 1U Rackmount LED Console
- Dell 6 GBps SAS HBA
- Dell Active Fabric Controller
- Dell Active Fabric Manager
- Dell Adaptec U320 SCSI Raid 0 or 1 Controller Card
- Dell and XFP Optical Transceiver
- Dell Broadcom NetXtreme Family of Adapters
- Dell Brocade 300
- Dell Brocade 5100
Dell Popular Categories
Audio
Televisions
Mobile Phones
Desktops
Laptops
Projectors
Servers
Tablets
Printers
Accessories
Modems
Storage
Coffee Makers
Fans
Remote Control
Monitors
Fax Machine
Routers
Speakers
Headsets
More Dell Manuals