HP Performance Optimized Data Center (POD) 20cp Service and Maintain | Page 45

HP Data Center Solutions Service and Maintain - Performance Optimized Data Center (POD) 20cp.
Download
Page  of 81
4.1, 2417 votes
background image

 

Removal and replacement procedures  45 

4.  Remove the two retaining screws, and then remove the hot-aisle temperature sensor housing from the 

wall. 

 

 

Replacing the hot aisle temperature sensor 

1.  Reconnect the wires to the hot aisle temperature sensor. 
2.  Reconnect the wires. 
3.  Re-attach the hot-aisle temperature sensor housing to the wall using the two retaining screws. 
4.  Replace the hot-aisle temperature sensor cover (1). 
5.  Replace the four screws that secure the hot-aisle temperature sensor cover (2). 

 

 

Fluid system components 
Chilled water supply and return header pressure sensors 

The HP POD 20c contains two chil ed water pressure sensors. One is located in the chilled water supply 

header and one is located in the return header. 
The chil ed water supply and return header pressure sensors are located in the cold aisle where the headers 
penetrate the HP POD 20c. 

0.484661s