Removal and replacement procedures  21 

Replacing the busway drop box 

  

 

WARNING:  Use caution when removing and replacing the busway drop box. The drop box 

weighs approximately 9 kg (20 lb). 

  

1.  Place the silver drop box bracket onto the electrical busway where you want to replace the busway 

drop box (1). 

2.  Note the required rotation indicated on the drop box, insert the drop box into the drop box bracket on 

the electrical busway, and then rotate the drop box 90° until it locks into place (2). 

  

 

CAUTION:   To prevent damage to the drop box and ensure that the drop box engages properly, 
be sure that the drop box is completely flush to the busway. If a drop box is damaged during 

instal ation, do not attempt to re-engage or repair the drop box. 

  

3.  Slide the hardware bracket to the left along the busway until it connects to the drop box (3). 
4.  Secure the busway drop box to the retaining hardware bracket by using a socket wrench to insert and 

tighten a bolt (4). 

 

5.  Connect the PDUs to the busway drop box (1). 