HP Performance Optimized Data Center (POD) 20cp Getting Started Guide | Page 37

HP Data Center Solutions Getting Started Guide - Performance Optimized Data Center (POD) 20cp.
Download
Page  of 38
4.9, 1392 votes
background image

 

Index  37 

A 
about this guide   5 
areas prone to lightning or power surges   21 

assembly   29 
assembly area   23 

C 
capacity limitations   7 
clearance area   8 

cold weather considerations   21 
communication connections   18, 19 

connection portals   16 
connections, additional   16 
connections, facility   16 

D 
delivery considerations   29 

dimensions   8 
drainage   13 

E 
electrical power capacity   7 
electrical system   15 

environmental considerations   21 
environmental control system (ECS)   16 
environmental risks   21 

equipment, installation   23 

F 
facility connections   16 
fire and safety   18 
fire suppression   6 

future expansions   10 

G 
grounding requirements   11 

H 
HP site preparation drawing package   22 

humidifier   12, 17 

I 
installation   23 

installation equipment   23 

L 
lifting layout and requirements   23 
lightning protection   21 

M 
materials, piping   14 
mechanical cooling capacity   7 

modifications, FCC notice   33 

O 
other objects   25 
overview   5 

P 
permit requirements   22 
piping materials   14 

power infrastructure installation   14 
power surges   21 
pre-delivery   29 

preparing for assembly   29 
project coordination   22 

R 
regulatory compliance identification numbers   33 
regulatory compliance notices   33 

regulatory compliance, HP POD 20c   5, 32 

S 
safety information   6, 33 
security   6, 18 
seismic activity   21 

site assessment   6, 22, 26 
site assessment checklist   26 

site pad   8 

Index 