background image

 

Site plan requirements and actions  24 

•  Assembly equipment locations 

 

 
Item 

Description 

Crane 

Reach 

Truck 

Area clear for scissors lift and forklift 

 

HP POD 20c lifting requirements 

   

 

WARNING:  The only approved method for lifting the HP POD 20c is the use of a spreader bar 
harness. Lifting an HP POD 20c in any other manner can cause damage to the HP POD 20c and 

void your warranty. The harness and lifting connections must be perpendicular to the lifting 
blocks.    

   

 

HP POD 20c storage requirements 

If the site is not ready for assembly and operation, determine a location for storage when creating the site 

plan. 

   

 

CAUTION:    The HP POD 20c must maintain 20% relative humidity to minimize condensation and 

oxidation within the HP POD 20c. 

   

   

 

CAUTION:    While being stored, the HP POD 20c must be kept in a level position even if stored 

on a trailer. 

   

Changes in ambient temperatures can cause condensation in a non-operational HP POD 20c. If the HP POD 
20c is placed in storage or is in non-operating mode for over 72 hours, HP recommends using one of the 

fol owing methods to minimize condensation and oxidation within the HP POD 20c: 
•  Desiccant unit 
•  Desiccant material 
•  Heater with a fan 
•  Air conditioner with a heater strip 
Consult with HP Services to determine the most effective method. 

 