Craftsman 247.77099 Operator's Manual | Page 8

Craftsman Yard Vacuum Operator's Manual - 247.77099.
Download
Page  of 52
4.6, 2250 votes
background image

8

ATTACHING THE BAG

Grasp bag handle with one hand and slide locking 
rod on mounting bracket with other hand toward 
engine. Use the end of mounting bracket as 
leverage when sliding the locking rod. See Figure 6.

Figure 6

Slip bag over the rim of the discharge opening and 
release locking rod to secure bag in place.

Snap bag clip to the top of the lower handle.

Place the lower straps on the bag over the top of 
lower handle, hooking them on the studs.

NOTE:  The bag/chute switch button attached to the
mounting bracket must be fully depressed by the tip of
front tab on bag handle when securing the bag or
engine will not start.

ATTACHING THE BLOWER CHUTE

NOTE: The bag must be removed before installing the
blower chute.

Grasp blower chute with one hand and slide lock-
ing rod on mounting bracket with other hand 
toward engine. Use the end of mounting bracket 
as leverage when sliding the locking rod.
See Figure 7.

Slip blower chute over rim of discharge opening 
and release locking rod to secure chute in place.

Raise the nozzle height to the highest setting 
when using the blower chute. Refer to nozzle 
height adjustment in the ADJUSTMENT section 
on page 11.

NOTE:  The bag/chute switch button attached to the
mounting bracket must be fully depressed by the tip of
front tab on the blower chute or engine will not start.

Figure 7

Bag Handle

Strap

Stud

Front

Stud

Locking

Bag Clip

Rod

Bag/Chute
Switch
Button

Tab

Front
Tab

Locking
Rod

Locking
Rod

Blower
Chute

Front
Tab

Engine Removed
For Clarity

Bag/Chute
Switch
Button

0.504393s