Carrier 50EW User's Manual

Carrier Air Conditioners User's Manual - 50EW.
Download
Page  of 56
4.6, 1095 votes
background image

Installation, Start-Up and

Service Instructions

CONTENTS

Page

SAFETY CONSIDERATIONS . . . . . . . . . . . . . . . . . . 1
INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-31
Step 1 — Provide Unit Support . . . . . . . . . . . . . . 1
• ROOF CURB
• ALTERNATE UNIT SUPPORT
Step 2 — Rig and Place Unit . . . . . . . . . . . . . . . . . 8
• POSITIONING
• ROOF MOUNT
Step 3 — Field Fabricate Ductwork . . . . . . . . . . . 11
Step 4 — Make Unit Duct Connections . . . . . . . 11
Step 5 — Trap Condensate Drain . . . . . . . . . . . . . 11
Step 6 — Controls Options . . . . . . . . . . . . . . . . . . 12
• CONSTANT VOLUME APPLICATIONS
• VARIABLE AIR VOLUME (VAV)

APPLICATIONS

Step 7 — Make Electrical Connections . . . . . . . 15
• POWER WIRING
• FIELD POWER SUPPLY
• FIELD CONTROL WIRING
Step 8 — Make Outdoor-Air Inlet

Adjustments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

• ECONOMIZER
• ECONOMIZER SETTINGS
Step 9 — Position Power Exhaust/

Barometric Relief Damper Hood . . . . . . . . . . . . . 29

Step 10 — Install Accessories . . . . . . . . . . . . . . . 30
START-UP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32-42
SERVICE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42-45
TROUBLESHOOTING . . . . . . . . . . . . . . . . . . . . . . 46-51
START-UP CHECKLIST . . . . . . . . . . . . . . . CL-1, CL-2

SAFETY CONSIDERATIONS

Installation and servicing of air-conditioning equipment

can be hazardous due to system pressure and electrical com-
ponents. Only trained and qualified service personnel should
install, repair, or service air-conditioning equipment.

Untrained personnel can perform basic maintenance func-

tions of cleaning coils and filters and replacing filters. All
other operations should be performed by trained service per-
sonnel. When working on air-conditioning equipment, ob-
serve precautions in the literature, tags and labels attached
to the unit, and other safety precautions that may apply.

Follow all safety codes. Wear safety glasses and work gloves.

Use quenching cloth for unbrazing operations. Have fire ex-
tinguishers available for all brazing operations.

Before performing service or maintenance operations on
unit, turn off main power switch to unit. Electrical shock
could cause personal injury.

IMPORTANT — READ BEFORE INSTALLING

IMPORTANT: Due to upgrades in unit control soft-
ware and hardware, units produced currently are slightly
different than original design units. The unit control
software (which has changed) is designated with a sticker
on the unit control board, chip U8 (the large chip in
the center of the board), which states the software Ver-
sion number. Version 1.0 is the original version. Ver-
sion 2.0 is the current version. Differences in instal-
lation, configuration, and start-up procedures in this
manual will be identified by Version number.

INSTALLATION

Step 1 — Provide Unit Support

All panels must be in place when rigging. Unit is not
designed for handling by fork truck.

ROOF CURB — Assemble and install accessory roof curb
in accordance with instructions shipped with the curb. Ac-
cessory roof curb and information required to field fabricate
a roof curb or horizontal adapter are shown in Fig. 1 and 2.
Install insulation, cant strips, roofing, and counter flashing
as shown. Ductwork can be secured to roof curb before unit
is set in place.

IMPORTANT: The gasketing of the unit to the roof
curb is critical for a leak-proof seal. Install gasket sup-
plied with the roof curb as shown in Fig. 1. Improp-
erly applied gasket can result in air leaks and poor unit
performance.

Curb should be level. This is necessary to permit unit drain

to function properly. Unit leveling tolerance is shown in
Fig 1 and 2. Refer to Accessory Roof Curb Installation In-
structions for additional information as required. When ac-
cessory roof curb is used, unit may be installed on class A,
B, or C roof covering material.

ALTERNATE UNIT SUPPORT — When the curb or adapter
cannot be used, support unit with sleepers using unit curb or
adapter support area. If sleepers cannot be used, support long
sides of unit (refer to Fig. 3-6) with a minimum number of
equally

spaced

4-in.

x

4-in.

pads

as

follows:

50EJ,EK,EW,EY024-034 units require 3 pads on each side;
50EJ,EK,EW,EY038-048 require 4 pads on each side. Unit
may sag if supported by corners only.

50EJ,EK,EW,EY024-048

Single-Package Rooftop Units

Electric Cooling with Electric Heat Option

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

Book 1
Tab

1b

PC 111

Catalog No. 535-006

Printed in U.S.A.

Form 50E-3SI

Pg 1

8-96

Replaces: 50E-1SI

Related Manuals for Carrier 50EW

0.505827s