APC Symmetra LX 48 kVA User's Manual

APC Battery Charger User's Manual - Symmetra LX 48 kVA.
Download
Page  of 2
4.8, 1181 votes
background image

Symmetra  LX 

Start-Up Guide

Extended Run Cabinets

For use with Symmetra LX UPS models: 

990-1873-001      04/2005

®

200V, 4–8 kVA

208/240V, 4–8 kVA

220/230/240V, 4–8 kVA

200V, 4–16 kVA

208/240V, 4–16 kVA

220/230/240V, 4–16 kVA

READ FIRST

Important Safety and Installation Instructions

This guide is applicable for the Symmetra LX tower and rack-mount 
extended run cabinet models. These units provide extended run time for the 
Symmetra LX tower or rack-mount UPS models.

See and retain the product documentation shipped with your system for 
other important installation, operation, and maintenance instructions.

Illustrations are representative. The Symmetra LX configuration, including 
components and optional APC equipment, may be different from the models 
shown in this guide. 

Entire contents copyright 2005 by American Power Conversion Corporation. 
All rights reserved. Reproduction in whole or in part without permission is 
prohibited. 

APC, the APC logo, InfraStruXure, PowerChute, Smart-UPS and Symmetra 
are registered trademarks of American Power Conversion Corporation. All 
other trademarks are the property of their respective owners.

9-Battery
Rack-mount
Extended Run

9-Battery
Tower
Extended Run

3-Battery
Rack-mount
Extended Run

Overview

1. Read Safety and General Information Instructions

2. Refer to the UPS Documentation

If installing the Symmetra LX and the Extended Run Cabinet(s), 
install according to the instructions in the Symmetra LX Start-Up 
Guide 
shipped with the UPS.

3. Install the Extended Run Cabinet(s)

Perform the physical installation for the extended run cabinet(s). 
See the included Symmetra LX Physical Installation Guide.

4. Follow the proceeding Start-Up Instructions 

See these instructions once the physical installation for the 
Extended Run Cabinet(s) is complete. This section contains 
information on how to connect, test, and start the unit. 

Electrical

Hazard

Read, understand and follow ALL safety 
instructions contained in the Symmetra LX Safety 
Instructions and General Information Guide

Failure to follow safety instructions and warnings 
could result in equipment damage, serious injury, 
or death.

Start-Up Instructions

1. Connect the first Extended Run Cabinet

1.1 Remove the screw and battery connector cover 

 from the 

back of the UPS.

1.2 Connect the power cable 

 of the first extended run cabinet 

to the UPS battery connector 

.

1.3 Set the dial 

 of the extended run cabinet to ‘2’. 

1.4 Connect the communications cable 

 from the extended run 

communications connector on the UPS 

 to the connector on 

the extended run cabinet 

.

Note

The illustrations shown in this section are applicable for the 
tower and rack-mount extended run cabinets. 

Note

If connecting to a UPS with integrated extended run, set the 
dial of the first extended run cabinet to ‘3’ instead of ‘2’.

Related Manuals for APC Symmetra LX 48 kVA

0.609108s